
About
See the price before anyone sees the bathroom
An independent bathroom remodeling service for homeowners across Butler County.
- Priced up front
Added up from what Cincinnati area trades are paid, current material costs, permits and a normal margin.
- Designed by you
Set the vanity, the glass, the tile and the finish in 3D. Every pick changes the number in front of you.
- Built by licensed pros
A licensed local contractor confirms the price and does the work.
Why the price comes first
One bathroom, three quotes, no explanation
Have three contractors look at the same bathroom and the numbers rarely agree. One comes in at half of the others. One lands 20% above them. None of them shows you what made the difference.
A lot of bath quotes are a guess from the doorway, or a form price that went to four other houses that month. Pricing a bathroom properly means checking what plumbers, tile setters and electricians around here earn, then adding the tile, vanity, glass and waterproofing you actually picked. That takes hours, so it often gets skipped.
We did that part. The price tool adds up your bathroom one line at a time from Cincinnati area wages, current material costs and permit fees, and it shows you each line. A fair number for you, and a fair one for the contractor who builds it.
One bathroom, three numbers
LaborTile and fixturesPermitsOverhead
How it works
From price to finished bathroom
- Step 01
Get the number
About a minute
Tell the tool what kind of bathroom it is and what is changing: the tub, the shower, the vanity, the tile, the toilet, the fan. Add your ZIP. You get three finish levels, each split into lines and built from Cincinnati area trade wages.
- Step 02
Design the room in 3D
A few minutes
Pick the room closest to yours, then set the vanity color, shower glass, wall tile and fixture finish and turn the room around. Each pick updates the price.
- Step 03
Have it confirmed
When you say so
A licensed local contractor comes out, measures, checks the subfloor and the pipes behind the wall, and confirms your number. Nobody comes out until you request that visit.
- Step 04
Build it
Often 1 to 3 weeks of work
Permits get pulled, the vanity and fixtures get ordered, and the crew starts. A hall bath that keeps its layout usually takes 1 to 3 weeks once work begins, with shower glass measured after the tile is up.
No visit needed to see it
See your bathroom price
About a minute. Your ZIP, your finishes, your bathroom in 3D.