Price my bathroom
White Shaker double vanity with a granite top under a three light fixture, a corner soaking tub and a framed glass shower

Bathroom services

Nine parts of a bathroom remodel

Pick the ones your bathroom needs, price them together and see the room in 3D.

How it works

Four steps, in your order

  1. Step 01

    Get the number

    About a minute

    Tell the tool what kind of bathroom it is and what is changing: the tub, the shower, the vanity, the tile, the toilet, the fan. Add your ZIP. You get three finish levels, each split into lines and built from Cincinnati area trade wages.

  2. Step 02

    Design the room in 3D

    A few minutes

    Pick the room closest to yours, then set the vanity color, shower glass, wall tile and fixture finish and turn the room around. Each pick updates the price.

  3. Step 03

    Have it confirmed

    When you say so

    A licensed local contractor comes out, measures, checks the subfloor and the pipes behind the wall, and confirms your number. Nobody comes out until you request that visit.

  4. Step 04

    Build it

    Often 1 to 3 weeks of work

    Permits get pulled, the vanity and fixtures get ordered, and the crew starts. A hall bath that keeps its layout usually takes 1 to 3 weeks once work begins, with shower glass measured after the tile is up.

No visit needed to see it

Price the whole bathroom at once

Tick what is changing and the number follows every pick.