Price my bathroom
Long gray wood grain vanity with a white top and a wide mirror beside a frameless glass shower with white marble look walls and a pebble floor

Shower remodels

Shower remodeling in Butler County

A tiled shower where the part you never see is done right.

White Shaker double vanity with a granite top under a three light fixture, a corner soaking tub and a framed glass shower
The part that matters

Waterproofing under the tile. A membrane over the walls and a pan sloped to the drain keep water out of the framing for decades.

Glass last

Frameless glass is measured once the tile is set, so it shows up about a week after the tile crew leaves.

  1. 01Niche

    A tiled shelf for bottles. It gets framed on an inside wall before the backer board goes up.

  2. 02Bench

    Built in or floating. Either way the blocking goes in the wall before tile.

  3. 03Valve

    A pressure balancing valve keeps the water steady when someone flushes.

In the price tool

Price it, then see it

  1. 01
    The price, one line at a time

    Plumbing, tile, the vanity, glass and the permit, each priced from what Cincinnati area trades are paid.

  2. 02
    Pick your bathroom

    Walk in shower, tub with a shower, a primary bath or a powder room. Start from the one that matches yours.

  3. 03
    Design it in 3D

    Choose the vanity color, the shower glass, the wall tile and the fixture finish, then turn the room around.

Shower remodels

Shower remodels questions

01How many days is a shower remodel?

About 1 to 2 weeks of work, then roughly a week for the glass.

02Can the drain stay where it is?

Yes, and keeping it there keeps the price down. Moving it means cutting into the floor.

03Does a new shower need a permit?

If plumbing moves or new lines run, yes. The contractor pulls it.

No visit needed to see it

Price it with your own picks

Vanity, tile, glass, fixtures. Every choice changes the number.